- B1 earth masonry
- B2 cob
- B3 rammed earth
Currently available for the EQF levels
L1 | L2 | L3 | L4 | L5 |
x | x | x | ||
x | x | |||
x | x |
Covers the following activities:
Cob. Rammed earth. Earth masonry.
(3 separate sub-units)
From the foundation or base,
- raise monolithic or masonry walls, load-bearing or not, straight or curved;
- build vaults, domes, staircases, heating devices, furniture;
- build structural details, openings and service;
- prepare surfaces to receive finishes.
- Organize the site, including lifting, storage and protection of materials and structures.